Oso Concrete in Phoenix Arizona can provide Commercial Electric Trenching, and Concrete Electric Panel Pads for Switch Gear and Transformers. We can handle any SRP or APS electrical upgrade underground work including CLSM 1/2″ Sack Material Item 5075313
The Professionals at Oso Concrete are Underground Contractors in Phoenix Arizona ready to handle your next electrical trenching needs. We can handle the cutting and haul away of Asphalt or Concrete and have the site ready for the electrician to trench or we can dig the trenches for you
Transformer Pads are usually 10′ x 10′ and 4′ deep requiring a lot of dirt to be removed and hauled away from the site. SRP requires for this pad to be filled with CLSM 1/2″ Sack Material Item 5075313 before the transformer pad can be installed. We can handle this entire process for you
Oso Concrete can prep and pour the concrete pads for the switchgear and electrical cabinets according to your plans. These pads can usually be done pretty quickly
We can cut and remove Asphalt for your trenching needs and offer haul away and disposal of the spoils
After the trenching and conduit installation is complete and inspected, we can compact and prep the trenches for paving and pour the CLSM 1/2″ Sack Material Item 5075313 for the transformer pad foundation